Snapshot – March 2023

Barbara Daoust
General Manager
First Service Residential

In case you missed the February 23, 2023 Board of Directors meeting, below is a “snapshot” of the General Manager’s report to the community.  The entire report begins on page 11 in the Meeting Resident Info Packet. – Click Here to download the PDF.

RVB Street Lights

  • The final details on replacing twelve street fixtures are being addressed by the association’s lighting engineer, Chris Monrad with Mountain Power Electrical Contractors.
  • Waiting on an installation date for the new light fixtures along RVB (starting at Safeway).

Park Furniture Replacement

  • Park furniture installation for Big Wash, Sunset Ridge, and Lost Coyote Trail is completed.
  • Wildlife Ridge Parks and Woodshade Trails missing bench slates have been ordered and will be installed on arrival.

Wildlife Fencing Project

  • Update from the Town of Oro Valley: The subcontractor, Seller and Sons has reported delays with the fabrication of the gates for this project.
  • The anticipated completion date for this project is March 2023.
  • The Town will be covering the cost of the fencing for temporary nursey that AAA Landscape established due to this project.
  •  Some common area shrubs needed to be moved in the Scenic Overlook Pl and Big Wash Overlook PL entrance areas.

Capital Projects

  • Irrigation – This project entails the replacement of the irrigation system for common areas along Innovation Drive and Desert Fairways Dr. Bids are currently being solicited for this project.
  • Painting – The project includes reserve components #510- Common area metal fence in Vistoso Heights, #710 retention basin perimeter fence in Overlook, #2014 – Siena entry walls and gates and #1320 – Metal rails along Vistoso Highlands Dr. The RFP is being developed and bids will be solicited shortly for these projects. 
  • Asphalt – Reserve components #150 – parking lots at Wildlife Ridge and Hohokam parks & #152B – parking lots/common area at Big Wash Park, Woodshade Trailhead & Eagle Summit path are scheduled for April 2023 to be repair/seal.
For the Month of January 2023 
ARC Submittals: 33
Denied: 2
Approved: 27
Pending Information/Review: 4

Resale Inspections: 36

Total Open Work Orders: 51
New Work Orders: 8
Closed/Completed: 4

Tennis Cards Processed
New: 1

Walk-ins: 13

Calls Received: 121 
Call Center: 339

Violations- New: 36
Parking is the top compliance issue this past month. 
Total Open Violations: 386