Snapshot – November 2026

Barbara Daoust
General Manager
First Service Residential

Management Report – October 2026

September 2026 Activity Summary

VCA Staff

Please join me in welcoming Andrea Rodriguez to our team as our new Community Standards Coordinator.

Andrea brings a diverse background in HOA management, transaction coordination, and real estate. She enjoys working with people, building positive relationships, and helping things run smoothly.

Andrea is excited to get to know the Vistoso Community and looks forward to meeting residents, board members, and team members alike.

We are thrilled to have Andrea join our team and know she will be a great asset to our community.

2027 Budget Process

At the October 29, 2026, General Session Meeting, the Board will be adopting the 2027 budgets. The proposed budgets include a $10.00 quarterly increase for Siena owners and a $4.00 quarterly increase for the Master Association.

The Siena increase will be directed toward reserve funding, helping ensure adequate resources are available for future community repairs, replacements, and capital projects.

The Board of Directors has identified several capital improvement projects for 2027 that are designed to maintain and enhance the community’s infrastructure, amenities, and overall appearance.

Planned projects include repairs or replacement of playground equipment and site furnishings at Monticello, Somerset, Torreno, and Cortona Parks; asphalt repairs and seal coating at Sunset Ridge, Hohokam, Big Wash, Woodshade Trail, Vista Mirabella, Wildlife Ridge, and Moore Loop parking lots, as well as pathways at Eagle Summit and Valley Vista; and concrete repairs throughout community common areas.

Additional projects include replenishing decorative granite in St. Andrews I, Vistoso Crossing, Discovery, and Siena; converting park lighting to energy-efficient LED fixtures at Hohokam and Wildlife Ridge Parks; painting improvements in Horizon and Vistoso Heights; refurbishment of the Oracle Road monument; and irrigation system repairs along La Cañada Drive, Vistoso Vista Drive, and Rancho Vistoso Boulevard.

These investments reflect the Board’s ongoing commitment to preserving community assets and ensuring residents continue to enjoy safe, attractive, and well-maintained common areas.

Morning Vista Development

At the October Board meeting, the Board of Directors will review and consider the proposed exterior building lighting for this project, as recommended by the Architectural and Landscape Review Committee (ALRC).

The development building design plans were approved by the Association last month. The project will consist of 18 townhomes located within a new Sub-Association in Rancho Vistoso.

2027 Yard Sale Dates

The Community Fall Yard Sale appeared to be a great success, with Rancho Vistoso roadways bustling with treasure hunters throughout the event.

A total of 73 participants registered to use the interactive ZeeMaps platform to showcase the items they had for sale and help shoppers easily locate participating homes.

The Board will review and consider dates for next year’s yard sales, as well as the annual fall event, during its October meeting.

Irrigation Project

Currently, we are in the third phase of this project. Improvements to the irrigation system along Maspalomas and Woodburne have been completed, and repairs are continuing on Hidden Springs Drive.

The final phase of the project will focus on the Siena neighborhood.

Once completed, these enhancements will improve the performance and efficiency of the irrigation system while helping to reduce overall water consumption and conserve valuable water resources.

Bell Tower Artificial Turf Replacement

The Bell Tower Monument Enhancement Project has been completed, giving the Vistoso Highlands a refreshed and attractive new look.

As part of the community’s ongoing commitment to reducing water consumption, the artificial turf was replaced with decorative granite.

The project also included irrigation system upgrades within the planting beds, along with the addition of new plants and boulders to enhance the monument’s overall appearance and curb appeal.

Photography Contest

The Association has received several photo contest entries and would like to thank all participants for sharing the special moments they were able to capture.

Please join us at the Fall Event at Moore Loop Park on Saturday, October 24, where the winners will be announced at approximately 10:00 a.m.

Winning entries will also be displayed at the VCA Office in the near future.

Fall Event

Residents are invited to gather at Moore Loop Park on Saturday, October 24, from 8:00 a.m. to 11:00 a.m. for a morning of fall fun and community connection.

Our Police and Fire Departments will be on hand to help celebrate with residents.

Event Highlights

  • Halloween Costume Contest at 10:00 a.m.
  • Announcement of the Community Photography Contest winners
  • Opportunities to meet neighbors and enjoy a festive community atmosphere

Don’t miss this chance to celebrate the season and connect with fellow residents. We look forward to seeing you at Moore Loop Park!

A big thank you to AAA Landscape for sponsoring this event.

Hohokam Dog Park

The Board will be reviewing proposals at the October 29 meeting to upgrade the dog park by replacing the existing pea gravel with decorative granite, similar to the material installed at the Moore Loop Dog Park.

This enhancement is intended to improve the appearance, functionality, and enjoyment of the facility as part of the Association’s commitment to maintaining and enhancing community amenities.

2026 Capital Projects

The following capital projects have been slated and budgeted for 2026:

  • Entryway Monument Refurbishment: Refurbish entryway monuments at Rancho Vistoso Boulevard and Oracle Road.
  • Irrigation Repairs – $203,041: Repairs on Maspalomas, Hidden Springs, and Woodburne Drive from Rancho Vistoso Boulevard to Wildlife Ridge Park, as well as the park. The Board selected AAA Landscape for this project.
  • Monument Signage Refurbishment – $9,776.97: The Board approved refurbishment proposals for Stone Terrace, Hohokam Park, Somerset Canyon, and Monticello monuments.
  • Moore Loop Park Playground – $8,125: Replenish playground wood fiber.
  • Hohokam Park Playground Equipment – $123,860: Replace playground equipment.
  • Hohokam Park Furniture – $109,640: Replace picnic tables, benches, trash cans, and barbecues.
  • Torreno Park East Drinking Fountain: Replacement has been delayed due to the current condition of the fountain.
  • Common Area Wall Repairs: Repairs have been completed in conjunction with the painting project.
  • Common Area Painting – $65,815: The Board selected Facelift Painting to paint common area walls, rails, bollards, and tennis court fencing. The project includes St. Andrews 1 & 2, Stone Terrace, Bella Vista, Maravilla, Somerset Canyon, Stone Field, Monticello, Cortona, and Vistoso Crossing.
  • Bell Tower Artificial Turf Replacement – $14,441.55: The Board approved replacing artificial turf with decorative rock. The irrigation system for the monument’s planting beds has been updated.
  • Hohokam Dog Park Replenishment: The project will be discussed at the October 29 meeting.
  • Sunset Ridge Park Asphalt Parking Lot: This project is being delayed.
  • Drainage Basin Mitigation and Repair: The Board approved Bogardus Engineering’s proposal to assist the Association with this project.
  • Center Pointe Granite Replacement: Replacement of granite in the medians has been rescheduled to coincide with the La Cañada medians and right-of-way project.

VCA Paint Palette

Homeowners who are considering painting their homes can view the new approved paint colors on the Dunn-Edwards website or the community website.

Available Resources

Before starting your project, please submit an Architectural and Landscaping Change Form (ALCF), available on the community website.

If you have any questions, please contact the Association office at askvca@ranchovistosohoa.com.